Build a takeoff for a garage slab with optional base and reinforcement quantities. Start with the published examples below, then use your own supplier quote for a delivered estimate.
4000 PSI concrete — $185 per cubic yard
Material price. Published Chicago supplier estimator rate for 4000 PSI concrete. Mix strength must follow your project specification; this is a material example, excluding placement and finishing.
Under 6 yards, cartage tiers range from $220 (1–2 yards) to $60 (5.1–5.99 yards). The estimator adds $75 beyond 7 miles, $15/yard hot water October–April, and separate weekend, Sunday, night, waiting-time, and tax charges. Obtain a complete quote.
Enter slab and thickened perimeter sections individually.
Confirm reinforcement and floor specification with your designer.
MEASURE. PLAN. BUILD.
Make it your estimate.
Set your dimensions below. Choose a published supplier price above, or enter your own quote.
Built for real projects. No sign-up. No guesswork.
A GOOD ESTIMATE STARTS HERE
Know what goes into your numbers.
Every estimate shows its assumptions. Adjust waste, material density, and delivery rules to match your job. Use your supplier’s actual prices for a more useful comparison.See how we calculate
3.26 yd³ incl. allowance
FROM MEASUREMENTS TO AN ORDER
Plan your concrete garage floor
What to measure
Measure the slab inside its forms. Treat a thickened perimeter or isolated pads as additional volume only.
If the design changes thickness around a drain, divide it into measured sections; the tool does not model slope automatically.
Illustrative dimensions and allowances. Use your project specification and supplier’s product data. Quantities shown are before supplier rounding.
Included in this quantity
Concrete for a uniform-thickness garage floor.
Measure or price separately
Footings, extra perimeter depth, base, vapor barrier, reinforcement, drains and finishing.
Choose the specified product
Use your designer’s floor and reinforcement specification. The reinforcement helper estimates grid length; it does not select steel or design the floor.
Before booking the order
Confirm clearance, discharge or pumping, placement timing and waiting charges. Price enabled base and reinforcement items before treating the project budget as complete.
General ready-mix ordering guidance; not a local supplier offer or a project mix specification. Any local prices on this page are attributed separately to the suppliers offering them.